This month I am doing the last few jobs to prepare the car for SVA. The list currently stands at:
-
Make new header tank pipes from copper and fix to the engine block.
-
Change the front springs
-
Rivet side panels underneath
-
Cover front suspension areas for SVA
-
Adjust headlights
-
Check all underbonnet wiring and pipes
-
Bolt down the nose properly
-
Re-pad the dashboard, with more padding along the bottom edge
-
Fit handbrake and gearlever gaiters
-
Change steering wheel and boss
-
Make an undertray for the rear
-
Check all rear wiring and pipes
-
Make and fit boot cover
-
Fit new fuel cap
-
Modify seats?
-
Edge trim seat belt holes in seats
-
Check self centreing
-
Check all pedal nuts
-
Stamp VIN number
-
Fit new engine mount rubbers (land rover)
-
Re-tension handbrake cables
The SVA is booked for the 5th of July, so I have spent a week at home finishing a few odds and ends off. I will let the pictures speak for themselves I think.